Soren

Real tonnes. Your agreed prices.

Whether collected or delivered, link every load to its project, net weight and the right contract line.

A conveyor feeds aggregate stockpiles in a limestone quarry.

The load has left before the purchase reaches the ERP. A ticket in the cab, a statement at month-end, a quantity known only after weighing. Build the purchase record from site evidence without losing the agreed rate.

01

Identify the right material

Material family, grading, source, intended use and transport method.

02

Capture actual tonnes

The net weight on the ticket, linked to the project and load.

03

Apply the right price

The contract rate checked against the statement and invoice.

From the field request to the invoice. Every detail matters.

One record for negotiated terms, site events and purchasing control.

01Order

Ex-quarry or delivered: compare like with like.

A 0/31.5 aggregate is not a 0/4 sand, and a delivered rate is not a material-only price. Separate the product, quarry and terms to make costs comparable.

  • Product reference and d/D grading
  • Material and transport prices separated
  • Direct collection, own fleet or third-party carrier
CMD-02418

Select suppliers

Framework agreement
Limestone aggregate · 0/31.5

Supply · delivered to site

Near the siteFramework agreement
QuarryMaterial + transportDelivered / t
Compare the terms

Same product, unit and destination

02Track on site

The weighbridge ticket becomes the purchase record.

When teams collect directly, final weight is unknown until the weighbridge. Link the ticket to an open order, a project and the relevant cost allocation.

  • Gross, tare and net weights retained
  • Quarry, date, truck and ticket reference
  • Measured tonnes distinct from estimated cubic metres
CMD-02418

Order details

Confirmed
Limestone aggregate · 0/31.5

Supply · delivered to site

TrackingDocuments 2Invoicing
PES-08421
18.60net tonnes
Gross weight
32.40 t
Tare
13.80 t

Loaded at quarry

16 Sept · 07:42

Weighbridge ticket received

16 Sept · 07:48

Allocated · Les Rives / Roadworks

16 Sept · 09:10
03Check the invoice

A monthly statement with the evidence to match.

Group the period’s loads and check quantities, product references and contract rates. Missing evidence and incorrect allocations can be reviewed before accounting regularisation.

  • Billed prices checked against negotiated rates
  • Missing tickets, duplicates and variances for review
  • Allocation by project, job or task
FAC-2026-0942

Invoice review

To match
Limestone aggregate · 0/31.5

Supply · delivered to site

OrderReceiptInvoice
The contract rate was not applied.
ReferenceExpectedBilled
Aggregate · 18.60 t€230.64€262.26
Transport · 18.60 t€141.36€141.36
Total excl. tax€372.00€403.62
Variance identified€31.62

The contract rate was not applied.

€14.10 / t billed · €12.40 / t agreed
Documented checkPES-08421 · Framework agreement

Start with your contracts. And a real project.

Your suppliers, site documents and approval rules shape the workflow. Together, we scope the data to collect and the exchanges needed with your ERP.

Discuss your workflow

Questions from procurement teams.

What if our teams collect directly from the quarry?

This is a core workflow. An open order can cover a supplier and period, with tickets adding actual quantities collected. The collection of documents is defined with your teams and the quarry.

Can cubic metres be converted into tonnes automatically?

Volume helps estimate demand. Conversion depends on the material and its density; it does not replace weighing. A purchase billed per tonne should retain measured net weight as its reference.

Does Soren replace the quarry or carrier?

No. You keep your commercial relationships and carriers. The workflow covers purchase terms, documents, quantities and reconciliation. ERP and quarry system exchanges are scoped at the start.

Bring your contracts into every load.