The right mix. The right pour. The right price.

From the pour schedule to the invoice, connect ordered concrete, received volumes and the plant’s agreed terms.

Two workers pour and spread concrete on a reinforced slab, seen from above.

A mixer delivers more than cubic metres. It delivers a mix for a specific element at a specific time. Delivery notes, reservations and charges need to keep that context through to invoice review.

01

Define the mixes

Project specifications linked to the references used by your plants.

02

Track each delivery

A time slot, volume and structure identified on every note.

03

Review the cost of each pour

Concrete, pumping, transport and extras checked against your terms.

From the field request to the invoice. Every detail matters.

One record for negotiated terms, site events and purchasing control.

01Order

Your specifications, in each plant’s language.

Two plants may name a mix differently. Map supplier references to the prescribed characteristics and the project’s negotiated rate.

  • Specified strength, exposure and consistency
  • Supplier mix linked to the structural element
  • Transport, pumping and small-load conditions
CMD-02418

Select suppliers

Framework agreement
Slab · Building A / Level 1

Specified mix · C30/37 · XC2 · S3

Near the siteFramework agreement
Plant / mixConcrete / m³Pumping
Compare the terms

Technical mapping to validate · excluding extras

02Track on site

Every mixer load finds its structural element.

Plan volumes, time slots and delivery cadence. On receipt, keep the note, mix and actual pour locations connected, even when one load serves several elements.

  • Building, level and element to be poured
  • Delivered volume allocated to each element
  • Receipt, reservations and related quality records
CMD-02418

Order details

Confirmed
Slab · Building A / Level 1

Specified mix · C30/37 · XC2 · S3

TrackingDocuments 2Invoicing
BL-01942
7.50m³ delivered
Level 1 slab
5.00 m³
Level 1 wall
2.50 m³

Pour slot confirmed

17 Sept · 07:00

Mixer received · mix F-302

17 Sept · 07:10

Volume allocated to both elements

17 Sept · 07:45
03Check the invoice

The price per cubic metre is only part of the check.

Match received volumes to the billed mix. Separate waiting time, pumping and other charges to review what your agreement provides.

  • Delivery notes matched to invoice lines
  • Additional charges reviewed with their evidence
  • Spend by mix, plant and project
FAC-2026-0942

Invoice review

To match
Slab · Building A / Level 1

Specified mix · C30/37 · XC2 · S3

OrderReceiptInvoice
An extra charge needs evidence.
ReferenceExpectedBilled
Concrete · 7.50 m³€840€840
Additional waiting€0€65
Total excl. tax€840€905
Variance identified€65

An extra charge needs evidence.

Waiting time to check against delivery note and terms
Documented checkBL-01942 · Framework agreement

Start with your contracts. And a real project.

Your suppliers, site documents and approval rules shape the workflow. Together, we scope the data to collect and the exchanges needed with your ERP.

Discuss your workflow

Questions from procurement teams.

How are plant-specific mix names handled?

Setup connects each supplier reference to specified characteristics and its price line. Your technical teams must validate the mapping: similar names do not establish equivalence.

Can one delivery note cover several structural elements?

The workflow allows a delivery volume to be allocated across the relevant locations while retaining the original note reference, so quantities can be traced by building, level or element.

Does procurement control replace quality acceptance?

No. Technical decisions stay with qualified people. Reservations, rejections, declared additions and test results provide context for the purchase record. Document formats and plant connections are defined together.